A roofing estimate, line by line
A complete sample estimate for one tear-off and re-roof, with every section explained. It is an invented job from the RoofParrot demo, not a customer’s quote: the contractor, the homeowner and the address are made up, and every figure comes from the demo’s recorded quote run through the same arithmetic the estimate maker uses. Nothing on this page was typed in by hand.
The job, in one sentence
Everything below was priced from this description, which is what a contractor said to the demo:
“tear off one layer on a 2,400 square foot roof, 8/12, architectural, synthetic underlayment, 40 ft of ridge vent, 3 pipe boots and a chimney”
1. Who it is from, who it is for, and how long it holds
An estimate opens with the two parties and three facts: a number, a date, and the date the price stops holding. The number is how the invoice that follows refers back to it; the two dates are how a homeowner knows, in March, that the figure they are holding was good until February. The contractor’s license number goes in the header because many states require it on anything that quotes a price.
From
Dalton Roofing
License OH-44212
216 555 0184
Prepared for
Mrs Alvarez
12 Oak St
The roof
24 squares, 8/12
2,192 sq ft of footprint, traced on the aerial photo
- Date
- October 28, 2026
- Price holds until
- November 27, 2026
- Hold
- 30 days, the trade’s habit
2. The line items
Every line needs five things: what it is, how many, in what unit, the price per unit, and whether sales tax applies to it. The amount is quantity times unit price, rounded once, to whole cents. A line that is missing its unit (“shingles, $450.00”) is a line a homeowner cannot check against a second quote, and a line whose quantity is hidden inside the price is one that cannot be changed when the roof turns out bigger.
| Description | Qty | Unit | Unit price | Amount |
|---|---|---|---|---|
| Tear off 1 layer and haul awaynot taxable | 24 | square | $100.00 | $2,400.00 |
| Shingles, installed | 26.4 | square | $450.00 | $11,880.00 |
| Underlayment | 24 | square | $18.00 | $432.00 |
| Steep pitch charge (8/12)not taxable | 24 | square | $45.00 | $1,080.00 |
| Ridge vent | 40 | ft | $9.00 | $360.00 |
| Pipe boot | 3 | ea | $45.00 | $135.00 |
| Chimney flashing | 1 | ea | $450.00 | $450.00 |
| Dumpsternot taxable | 1 | ea | $450.00 | $450.00 |
- Subtotal
- $17,187.00
- Sales tax
- $0.00
- Total
- $17,187.00
Two things worth noticing. The shingles are priced on 26.4 squares and the tear-off on 24: the difference is the waste allowance, which applies to what is ordered and not to what is removed. And the lines that are not taxable say so — in most states labor and hauling are not taxed and materials are, and the estimate has to know which is which before the next section can be right.
3. Why tax is computed once
The demo’s quote was recorded with no sales tax, so to show the rule the same lines are taxed here at 8.25%, the rate the estimate maker’s worked example uses. The rate is applied once, to the taxable subtotal — not to each line and then added up.
- Taxable subtotal (the lines not marked otherwise)
- $13,257.00
- Tax, computed once at 8.25%
- $1,093.70
- Tax, computed per line and summed
- $1,093.71
- Difference
- +$0.01
On these 8 lines the two methods already disagree by that much. each per-line tax is rounded to a cent, and 5 roundings drift from one by a cent or two on a long estimate. A customer who adds the column up and finds the printed total a cent out stops trusting the whole document, so the engine rounds once and holds every amount as a whole number of cents from end to end.
4. Deposit, balance, and what is held back
The estimate asks for a deposit, which is a share of the total due before the work starts, and shows the balance that follows. On this one the deposit is 30%:
- Total
- $17,187.00
- Deposit due now (30%)
- $5,156.10
- Balance on completion
- $12,030.90
When the estimate is accepted and becomes a job, the same total is scheduled in three stages rather than two. The deposit is unchanged; the balance is split so that a small share — 2% on a job this size — is held until the work is signed off. That is what the contractors whose advice this product follows recommend, and it is set now because afterwards it is a renegotiation:
- Deposit, before the work starts
- $5,156.10
- Balance, on completion
- $11,687.16
- Retained · 2% until sign-off, at sign-off
- $343.74
- The three together
- $17,187.00
Three percentages of a total almost never round to three figures that sum to it. One stage — the balance — absorbs the remainder, deliberately and visibly, so a homeowner who checks the arithmetic finds a schedule that adds up rather than one that is two cents out.
5. The date the price holds until
This estimate is dated October 28, 2026 and holds until November 27, 2026: 30 days, which is what the trade usually gives. Material prices move with the supplier, and a figure with no end date is one you can be held to in a different market. The date is printed on the document and computed from the issue date, never from the clock — so an estimate regenerated a week later says what it said the first time.
6. The terms
Four plain sentences, which are the estimate maker’s defaults and which this quote carried as recorded:
- This is an estimate, not a contract. Prices hold for the period shown above.
- Quantities are calculated from the measurements supplied and include the waste allowance shown.
- Material prices are subject to supplier change until the order is placed.
- Work not described above is not included and will be quoted separately.
The first one is the one that matters: an estimate is not a contract, and nothing here is signed. The other three say where the quantities came from, that the supplier can move the material price until the order is placed, and that anything not described is quoted separately — which is the sentence that settles most arguments about decking.
7. The same job, three ways
An estimate is one price for one specification. Before it, a proposal shows the homeowner the same job at two or three grades of shingle; the demo priced all three, and only the shingle line changes between them:
- Three-tab
- $16,527.00
- Architectural (laminated)
- $17,187.00
- Premium / designer
- $19,167.00
Make your own
Estimate PDF maker
This document, with your lines and your payment link. Free, with our line in the footer.
Proposal template
Scope, the three options side by side, the schedule and the hold date, before the estimate.
Invoice template
The same arithmetic after the work: the deposit received and the balance due.
Or skip the typing
Trace the roof on the aerial photo, describe the job in a sentence, and the lines above come back priced and ready to send. The demo shows it running on this job.
Every name and number on this page is invented for the demo. The arithmetic is real: how the math works lists the rounding rules and the coverage factors with their sources.